Croswell, Michigan System Installation & Start Up Photos
Where: Croswell, Michigan (about 90 minutes north of Detroit)
What: A 0.5 MGD design/ 1.3 MGD peak MBBR Retrofit of a 40 year old municipal plant
How: Two trains of three-stage MBBRs featuring 60 HP blowers & 240 of m3 AC500 Media
Why: Older, failing equipment; needed to upgrade plant in order to nitrify in a tight footprint
Who: Collaboration between AquaPoint, Kennedy Industries, Fleis & VandenBrink Engineering, & John E. Green Company
(Pro Tip: click on the thumbnails to enlarge the photos)